Project # 24002 - HACC Wide Flooring
Federal opportunity from C03343 - Clackamas County Housing Authority | 001 - Clackamas County Housing Authority • Clackamas County Housing Authority. Place of performance: OR. Response deadline: Mar 13, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
Project # 24002 - HACC Wide Flooring
Remove/replace existing carpet, resilient flooring, VCT, and underlayment, per the attached Scope of Work and Specifications.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Clackamas County Housing Authority is seeking bids for Project # 24002, which involves the removal and replacement of existing flooring including carpet, resilient flooring, VCT, and underlayment. The response deadline is set for March 13, 2024. This project provides an opportunity to enhance residential environments and may involve coordination with local construction standards and specifications outlined in the Scope of Work.
The Clackamas County Housing Authority aims to improve the quality of housing facilities by updating flooring materials under Project # 24002.
- Flooring contractors
- General contractors with flooring experience
- Subcontractors specializing in resilient flooring
- Remove existing carpet
- Replace resilient flooring
- Remove VCT
- Replace underlayment
- Follow attached Scope of Work and Specifications
- Completed proposal form
- Proof of relevant experience
- Detailed pricing breakdown
- Timeline for project completion
- Compliance with attached specifications
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Bidders must adhere to local building codes and standards
- Compliance with safety regulations during flooring installation
- Competitive pricing will be critical; consider unit pricing
- Factor in labor, materials, and disposal costs
- Consider teaming with flooring material suppliers
- Possible collaboration with local contractors for labor
- Potential delays due to supply chain issues for flooring materials
- Need to ensure continuity of housing operations during replacement process
- Is there a specific type or brand of flooring preferred?
- What are the permitted working hours?
- Are there any contingencies for unforeseen issues during replacement?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Attachment details about the Scope of Work are not provided in this notice
- No specific flooring types indicated in the brief
- Geographical restrictions or requirements not specified
- No references to mandatory pre-bid meetings or site visits
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.