Roll up shop doors
Federal opportunity from City of Yachats. Place of performance: OR. Response deadline: Dec 13, 2021.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 30 more rate previews.↓
Point of Contact
Agency & Office
Description
Roll up shop doors
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Yachats is seeking a contractor for “Roll up shop doors.” The notice shows a single clear requirement line but provides no technical specifications, quantities, or installation/location details. Responses are due by 2021-12-13 14:00:00+00:00. A bidder should treat this as a supply-and/or installation need and confirm scope, measurements, and performance requirements before finalizing pricing and schedule.
Procure roll-up shop doors (and potentially associated hardware and installation) for City of Yachats facilities.
- Commercial overhead/roll-up door manufacturers and authorized dealers
- Door installation contractors with experience in roll-up shop doors for municipal/commercial facilities
- Confirm scope: furnish only vs furnish-and-install for roll-up shop doors
- Site verification: take field measurements and assess opening conditions (structure, power, clearances)
- Door system selection: door type, materials, insulation/wind rating (if required), operator/controls (if required)
- Submittals: shop drawings/cutsheets (if requested)
- Procurement and fabrication lead time management
- Installation: framing preparation, mounting tracks/curtain, operator install (if applicable), safety devices
- Testing/commissioning and turnover (operation, maintenance info)
- Warranty/service support (if required)
- Confirm acknowledgement of the due date/time: 2021-12-13 14:00:00+00:00
- Scope statement covering whether proposal includes furnishing only or furnishing-and-installation of roll-up shop doors
- Product data sheets/options for proposed roll-up shop doors (materials, size ranges, operator options)
- Preliminary schedule including measurement/site visit (if needed), procurement lead time, installation duration
- Warranty and service approach for the door system and installation
- Itemized pricing (door(s), operators/controls if any, installation labor, disposal/removal if any, mobilization)
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- No PSC/NAICS, set-aside, solicitation number, or place of performance details are provided in the brief—confirm required procurement platform steps and any mandatory forms directly with the City of Yachats
- Confirm whether bids must include prevailing wage, bonding/insurance, or licensing requirements (not stated in the brief)
- Because the brief lacks quantities and specifications, structure pricing as clearly scoped line items with explicit assumptions (e.g., per-door pricing by measured size, operator included/excluded)
- Consider providing alternates: manual chain hoist vs motor operator; insulated vs non-insulated curtain; removal/disposal as an add
- Flag any lead-time sensitive components and tie pricing validity to measured openings and confirmed specs
- If you are a supplier without install capability, team with a local door installer to cover measurement, install, and warranty response
- If electrical work is required for operators, line up a licensed electrician sub (requirement not stated; confirm)
- Scope ambiguity: “Roll up shop doors” provides no quantities, sizes, or performance requirements—high risk of mispricing without a site measure and spec confirmation
- Schedule risk driven by door fabrication/lead times; without required-in-service dates, ensure schedule assumptions are explicit
- Installation conditions unknown (structural, electrical, access constraints); change risk if existing openings require remediation
- How many roll-up shop doors are required, and what are the opening dimensions for each?
- Is this furnish-only, install-only, or furnish-and-install?
- Are motor operators required? If yes, what voltage/phase is available and what control/safety features are required?
- Are there performance requirements (wind load, insulation/R-value, corrosion resistance, color/finish)?
- Is removal/disposal of existing doors included?
- Where is the place of performance (facility address) and are there access/working-hour constraints?
- What warranty terms does the City expect for the doors and installation?
- Are there any required bid forms, insurance/bonding requirements, or licensing requirements for work within the City of Yachats procurement process?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Quantities, sizes, and specifications for the roll-up shop doors
- Whether installation (and any electrical work) is included
- Location/place of performance and site conditions
- Required submittals/forms and procurement instructions for the City of Yachats
- Evaluation criteria/award basis and pricing format
- Warranty requirements and schedule/lead-time expectations
- Any bonding/insurance/licensing or prevailing wage requirements
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.