2026 Safe Routes to Schools Improvement Project
Federal opportunity from KW039702 - Public Works | PW - Public works • City of West Linn. Place of performance: OR. Response deadline: Apr 16, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
2026 Safe Routes to Schools Improvement Project Project generally includes installation of sidewalk, ADA ramps, and stormwater facilities along a 1,250 ft section of Bittner Street and Long Street. The Engineerâ??s estimate for this project is $723,062.00. 2026 Safe Routes to School Improvements Project
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The 2026 Safe Routes to Schools Improvement Project seeks to enhance pedestrian access by installing sidewalks, ADA ramps, and stormwater facilities along a 1,250 ft section of Bittner Street and Long Street. The total estimated budget for this project is $723,062. This opportunity presents a solid bid for contractors experienced in infrastructure improvements and ADA compliance.
The buyer aims to improve school accessibility and safety through infrastructure upgrades that meet ADA standards and enhance stormwater management.
- Install sidewalk along Bittner Street
- Install ADA ramps
- Construct stormwater facilities
- Complete improvements along Long Street
- Company profile and relevant experience
- Detailed project plan and timeline
- Compliance with ADA and local regulations
- Pricing breakdown following the Engineer’s estimate
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No specific solicitation number provided
- Detailed compliance requirements are unspecified
- Any noted deadlines for permits or pre-bid meetings are missing
- Details on existing site conditions are not included
- Lack of additional context on contractor licensing requirements
- There is no breakdown of phases within the project timeline
- Unknown local weather considerations that may impact timelines
- No information on potential funding sources or partnerships
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.