Progressive Design-Build Services for St. Helens 2MG Reservoir Replacement
Federal opportunity from KS051002 - Public Works | KS051 - Public Works • City of St. Helens. Place of performance: OR. Response deadline: Jul 11, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Progressive Design-Build Services for St. Helens 2MG Reservoir Replacement
The RFP is also available at www.sthelensoregon.gov/rfps. For questions or clarifications please contact Sharon Darroux, Engineering Manager, at sdarroux@sthelensoregon.gov. Addenda will be issued on the website not later than seven days prior to RFP closing date. The City will not mail notice of addenda but shall publish notice of any addenda on the website. It is the responsibility of Proposer to check the webpage for posted addenda and ensure their submitted proposal acknowledges all addenda.
Progressive Design-Build Services for Replacement of 2MG Reservoir
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.