#256092 Center Street Brick Sewer Rehabilitation
Federal opportunity from KS004302 - Engineering | KS004 - Engineering • City of Salem. Place of performance: OR. Response deadline: Jan 20, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
#256092 Center Street Brick Sewer Rehabilitation
Engineer's Estimate $1,200,000 to $1,400,000
CONTRACT NUMBER: 256092 DATE OF ADDENDUM: January 13, 2026
PROJECT NUMBER: 724110 CLOSING DATE: January 20 , 2026
TIME: 2:30 p.m.
CITY OF SALEM, OREGON
CONTRACTS AND PROCUREMENT DIVISION
PUBLIC WORKS DEPARTMENT
ADDENDUM NUMBER: 1
C
ENTER STREET BRICK SEWER REHABILITATION
Addendum No. 1 to the above-mentioned project for the City of Salem, Oregon, is a part of the contract
documents, and as such, supersedes anything within the specifications with which it may conflict.
CHANGES TO SPECIAL PROVISIONS:
DIVISION 4-SANITARY SEWER AND STORM DRAINS
Section 412-Manhole Rehabilitation
412.1.01A Scope
—Add the following text to the beginning of this Subsection of the Special Provisions:
Manhole Rehabilitation shall include cementitious lining of manholes followed by epoxy coating of
manholes. The entire interior manhole surfaces including the walls and bench shall be lined except the
channel of the mainline. The entire interior manholes surfaces shall be epoxy coated, including walls,
benches and channels. The entire interior manhole surface of SSMH 7873 including the walls and
benches shall be lined and coated except the channel of the mainline.
All other terms, conditions, and specifications within the bid documents shall remain unchanged and in
effect in their entirety.
Shawna Self, NIGP-CPP, CPPB, Manager
Contracts and Procurement
All bidders are required to provide evidence of the receipt and acceptance of this Addendum No. 1 with
their proposal. Signing in the space provided below and submitting the signed Addendum with the
proposal satisfies this requirement.
Receipt acknowledged and conditions agreed to this day of , 20 .
NAME OF FIRM:
SIGNATURE:
ADDENDUM ROUTE LOG
DATE OF ADDENDUM NO. 1
January 13, 2026
Project Number: 724110 ; Contract Number: 256092
Ben Haney, PE, Engineering Program Manager
Date signed:
James Winslow, PE, Assistant City Engineer
Date signed:
Allen Dannen, PE, City Engineer
Date signed:
1/13/2026
01/14/2026
1/14/2026
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.