RFP No. 256027 Architectural / Engineering Services for Salem-Willamette Valley Airport
Federal opportunity from City of Salem. Place of performance: OR. Response deadline: May 02, 2025.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
RFP No. 256027 Architectural / Engineering Services for Salem-Willamette Valley Airport
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Salem is seeking architectural and engineering services for the Salem-Willamette Valley Airport under RFP No. 256027. Interested vendors should prepare proposals for submission by the deadline on May 2, 2025. This opportunity may involve a wide range of design and engineering tasks crucial for the airport's development.
The buyer aims to engage qualified firms for architectural and engineering services to improve and expand facilities at the Salem-Willamette Valley Airport.
- Architectural firms with airport design experience
- Engineering firms specializing in transportation and aviation
- Companies with a track record of working with municipal projects.
- Assessment of existing airport infrastructure
- Development of design proposals
- Preparation of engineering plans and specifications
- Coordination with airport stakeholders
- Cost estimation and budgeting.
- Completed proposal document
- Firm's qualifications and experience
- Project approach and methodologies
- Team bios and relevant past projects
- Cost proposal and budget outline.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure adherence to all local, state, and federal regulations regarding airport design
- Include proof of necessary licenses and certifications.
- Consider a competitive pricing model based on cost estimation of similar projects.
- Evaluate fixed-price vs. time-and-materials agreements based on project scope.
- Consider partnership with local subcontractors for specialized services
- Explore collaboration with environmental consultants for compliance.
- Potential delays in the approval process due to regulatory requirements.
- Underestimating the scope of work needed for airport enhancements.
- Changes in funding or budget constraints impacting project scope.
- What specific improvements are prioritized by the City of Salem?
- Are there any existing studies or assessments available for review?
- What is the expected timeline for decision-making after proposals are submitted?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Details on specific deliverables required in the proposal
- Information on the budget for the project
- Clarification on the procurement method and evaluation criteria.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.