Skip to content
City of Salem

RFP No. 256027 Architectural / Engineering Services for Salem-Willamette Valley Airport

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KS0043-00013494
DepartmentCity of SalemStateORPostedDueMay 02, 2025, 04:00 PM UTCExpired

Federal opportunity from City of Salem. Place of performance: OR. Response deadline: May 02, 2025.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260001 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
+46 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 46 more rate previews.
Davis-BaconBest fitstate match
OR20260001 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
Piledriver
Base $55.79Fringe $15.81
+45 more occupation rates in this WD
Davis-Baconstate match
OR20260071 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Klamath
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (Excluding Form Work)
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates in this WD
Davis-Baconstate match
OR20260009 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Crook, Gilliam +4
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Salem
Agency
Not available
Subagency
Not available
Office
Shawna Self
Contracting Office Address
Not available

Description

RFP No. 256027 Architectural / Engineering Services for Salem-Willamette Valley Airport

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 23, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Salem is seeking architectural and engineering services for the Salem-Willamette Valley Airport under RFP No. 256027. Interested vendors should prepare proposals for submission by the deadline on May 2, 2025. This opportunity may involve a wide range of design and engineering tasks crucial for the airport's development.

Architectural servicesEngineering servicesAirport designMunicipal projectsInfrastructure improvement
What the buyer is trying to do

The buyer aims to engage qualified firms for architectural and engineering services to improve and expand facilities at the Salem-Willamette Valley Airport.

Who should pursue this
  • Architectural firms with airport design experience
  • Engineering firms specializing in transportation and aviation
  • Companies with a track record of working with municipal projects.
Work breakdown
  • Assessment of existing airport infrastructure
  • Development of design proposals
  • Preparation of engineering plans and specifications
  • Coordination with airport stakeholders
  • Cost estimation and budgeting.
Response package checklist
  • Completed proposal document
  • Firm's qualifications and experience
  • Project approach and methodologies
  • Team bios and relevant past projects
  • Cost proposal and budget outline.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure adherence to all local, state, and federal regulations regarding airport design
  • Include proof of necessary licenses and certifications.
Pricing strategy
  • Consider a competitive pricing model based on cost estimation of similar projects.
  • Evaluate fixed-price vs. time-and-materials agreements based on project scope.
Teaming and subs
  • Consider partnership with local subcontractors for specialized services
  • Explore collaboration with environmental consultants for compliance.
Risks and watchouts
  • Potential delays in the approval process due to regulatory requirements.
  • Underestimating the scope of work needed for airport enhancements.
  • Changes in funding or budget constraints impacting project scope.
Smart questions to ask
  • What specific improvements are prioritized by the City of Salem?
  • Are there any existing studies or assessments available for review?
  • What is the expected timeline for decision-making after proposals are submitted?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on specific deliverables required in the proposal
  • Information on the budget for the project
  • Clarification on the procurement method and evaluation criteria.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.