Bid No. 234056 Gundfos Pump Parts
Federal opportunity from City of Salem. Place of performance: OR. Response deadline: Jul 12, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Bid No. 234056 Gundfos Pump Parts
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
City of Salem is soliciting bids under Bid No. 234056 for “Gundfos Pump Parts.” The only confirmed due date in the notice is 2023-07-12 at 11:00 (UTC offset provided). Scope details, line items, and submission instructions are not included in the brief, so bidders should validate exact part numbers, quantities, and any brand/compatibility constraints before pricing. This looks like a straightforward supply/parts bid where competitiveness and ability to deliver OEM-specified parts on time will likely drive award.
Purchase Gundfos pump parts for City of Salem operations (likely maintenance/repair of existing pumps), using a formal bid process tied to Bid No. 234056 with responses due by 2023-07-12 11:00.
- Confirm whether parts must be OEM Grundfos (spelled “Gundfos” in title/description) or approved equivalents, and identify any compliance requirements tied to that.
- Obtain the buyer’s parts list (part numbers/descriptions), quantities, delivery location(s), and required delivery schedule.
- Source parts via authorized distribution (or manufacturer) and confirm lead times/availability.
- Prepare pricing (unit and extended) and any freight/handling terms consistent with the bid instructions.
- Assemble and submit the bid package by the response deadline (2023-07-12 11:00).
- Completed bid response for Bid No. 234056 (per City of Salem instructions).
- Itemized pricing aligned to the buyer’s line items (once obtained), including any freight/shipping details.
- Manufacturer/distributor documentation as required (e.g., proof of authorized distribution, certificates, part authenticity) if requested in the bid documents.
- Delivery/lead-time confirmation for each part number/line item.
- Signed representations/certifications required by the City of Salem bid forms (once obtained).
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Bid documents/attachments with line items (part numbers, quantities, specs)
- Submission instructions (portal/email, required forms, bid format)
- Delivery requirements (ship-to address(es), delivery deadlines, freight terms)
- OEM vs approved-equal rules and documentation requirements
- Evaluation/award basis and contract terms (warranty/returns, payment, taxes)
- Posted date and any Q&A deadline/contact information
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.