25PW15 - Parrott Creek Culvert Replacements
Federal opportunity from KR107901 - Administration | KR107 - Administration • City of Roseburg. Place of performance: OR. Response deadline: Mar 10, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 29 more rate previews.↓
Point of Contact
Agency & Office
Description
25PW15 - Parrott Creek Culvert Replacements
See Attached Bid Specification Documents
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The opportunity involves the Parrott Creek Culvert Replacements under solicitation 25PW15 from the Oregon Administration. This project aims to address infrastructure needs by replacing existing culverts, as detailed in the attached bid specification documents. The response deadline is set for March 3, 2026, providing ample time for bidders to prepare comprehensive proposals.
The buyer is looking to procure services for the replacement of culverts in Parrott Creek as specified in the documentation provided.
- Civil engineering firms with experience in culvert installation.
- General contractors with prior projects in infrastructure replacement.
- Environmental consultancies familiar with waterway management.
- Assessment of existing culvert conditions.
- Engineering design for new culvert installations.
- Site preparation and excavation for replacements.
- Installation of new culverts.
- Restoration of affected areas post-installation.
- Completed bid proposal form.
- Detailed project plan and timeline.
- Company qualifications and prior project experiences.
- Detailed cost breakdown.
- Compliance with environmental regulations.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Bidders must comply with local state regulations for construction.
- Environmental impact assessments may be required.
- Consider competitive pricing aligned with market averages for similar projects.
- Include provisions for potential material price fluctuations.
- Possible collaboration with environmental consultancies for compliance.
- Consider teaming with local suppliers for materials to reduce costs.
- Potential delays due to environmental reviews.
- Risk of budget overruns if unforeseen site conditions arise.
- Challenges in sourcing specific materials in compliance with regulations.
- What is the expected timeline for project approval?
- Are there specific environmental regulations that need to be prioritized?
- Will there be access limitations to the sites during the project?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific location details for the culvert replacements.
- Attached bid specification documents' content.
- Details regarding permits required for construction.
- Information on previous contracts or projects undertaken in the same region.
- List of mandatory qualifications or certifications for bidders.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.