Gate valves-water system
Federal opportunity from City of Pendleton. Place of performance: OR. Response deadline: Jan 26, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Gate valves-water system
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Pendleton has posted an opportunity titled “Gate valves-water system,” indicating a supply need for gate valves associated with its water system. The only clear schedule detail provided is a response deadline of 2023-01-26T14:00:00+00:00. The opportunity brief contains no specifications, quantities, or delivery location, so bidders should treat this as a high-risk/low-information notice until the City provides valve standards and ordering details. If your firm regularly supplies municipal waterworks gate valves and can respond quickly with compliant product data and lead times, this may be a good fit once missing details are confirmed.
Procure gate valves for the City of Pendleton’s water system (likely a parts/materials purchase for water infrastructure).
- Confirm required valve types and specifications for the water system (e.g., size range, pressure class, end connections, operator type, materials/coatings, certifications).
- Quote supply of gate valves per the City’s requested quantities and line items.
- Provide submittals/product data sheets and compliance documentation required by the City.
- Provide delivery (or pickup) plan including lead times, shipping terms, and any required labeling/packaging for municipal receiving.
- Warranty/returns support as required by the City of Pendleton.
- Completed pricing/quote for the City of Pendleton’s gate valve line items (once provided).
- Manufacturer cut sheets/data sheets for each proposed gate valve model.
- Compliance/certification documentation applicable to the specified water system requirements (as stated by the City).
- Lead time and delivery terms (shipping method, destination, incoterms/FOB if requested by the City).
- Warranty statement and any service/support terms.
- Vendor identification and point-of-contact information.
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Valve specifications (sizes, pressure class, end type, operator type, materials/coatings) and required certifications
- Quantities/line items and whether accessories are included
- Delivery location/place of performance and required delivery dates
- Solicitation number/notice type and official bid instructions/forms
- Posted date and current status (deadline shown is 2023-01-26)
- Evaluation/award criteria and any approved manufacturer list requirements
- Buyer website/resource links/attachments containing the actual requirements
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.