NW NYE STREET PAVEMENT REHABILITATION PROJECT
Federal opportunity from City of Newport. Place of performance: OR. Response deadline: Sep 09, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 36 more rate previews.↓
Point of Contact
Agency & Office
Description
NW NYE STREET PAVEMENT REHABILITATION PROJECT
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Newport is initiating the NW NYE STREET PAVEMENT REHABILITATION PROJECT, with a response deadline set for September 9, 2025. This project focuses specifically on rehabilitating pavement along Nye Street, presenting a targeted opportunity for contractors experienced in roadwork and infrastructure projects. Potential bidders should prepare detailed proposals highlighting their qualifications and relevant experience.
The City of Newport aims to enhance roadway conditions through the rehabilitation of the pavement on Nye Street, addressing potential safety and infrastructure concerns for motorists and pedestrians.
- Contractors with experience in pavement rehabilitation
- Local construction firms with knowledge of Newport's regulations
- Specialized subcontractors in roadwork and infrastructure improvements
- Detailed project approach and methodology
- Timeline for project completion
- Qualifications and experience of team members
- References from previous pavement rehabilitation projects
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Consider competitive pricing given the public sector bidding environment
- Include a breakdown of costs related to materials and labor
- Factor in potential overheads and profit margins appropriate for infrastructure projects
- Potential teaming with local subcontractors for specialized tasks
- Engagement with civil engineering firms for design input
- Collaboration with suppliers for asphalt and related materials
- Possible changes in project scope that could affect pricing
- Local weather conditions impacting project timelines
- Regulatory challenges specific to Newport's infrastructure guidelines
- What existing conditions or limitations will impact the project schedule?
- Are there specific sustainability practices required for material selection?
- What are the anticipated traffic impacts during construction?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Detailed specifications for the rehabilitation project
- Estimated budget for the project
- Any required permits or environmental considerations
- Information on previous pavement conditions
- Specific deadlines for milestones during the project
- List of required materials and their sources
- Contact information for city representatives
- Any unique local compliance requirements
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.