Skip to content
City of Newport

SE 32nd ST RRFB

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KN0010-00003505
DepartmentCity of NewportStateORPostedDueJul 12, 2022, 02:00 PM UTCExpired

Federal opportunity from City of Newport. Place of performance: OR. Response deadline: Jul 12, 2022.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Newport
Agency
Not available
Subagency
Not available
Office
Melissa Roman
Contracting Office Address
Not available

Description

SE 32nd ST RRFB

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Newport is seeking proposals for the SE 32nd ST RRFB project, which indicates a focused effort on traffic safety enhancements. This opportunity, identified under notice ID S-KN0010-00003505, has a response deadline of July 12, 2022, at 2:00 PM. Proposers should be prepared to deliver solutions that align with the project's goals for improving pedestrian crossings.

Rectangular Rapid Flashing Beacontraffic safetypedestrian crossingsNewport Oregon
What the buyer is trying to do

The buyer aims to enhance traffic safety by implementing a Rectangular Rapid Flashing Beacon (RRFB) system at SE 32nd St.

Who should pursue this
  • Contractors experienced in traffic safety measures.
  • Firms with expertise in pedestrian crossing systems.
  • Local companies familiar with Newport regulations and requirements.
Work breakdown
  • Review project specifications and requirements.
  • Develop a detailed proposal including design and installation plans.
  • Outline project schedule and milestones.
  • Prepare cost estimate and pricing strategy.
Response package checklist
  • Completed proposal form.
  • Detailed technical approach.
  • Company qualifications and project experience.
  • Cost breakdown and pricing model.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
No compliance notes extracted.
Pricing strategy
  • Consider competitive pricing in line with local market conditions.
  • Ensure pricing reflects all material and labor costs for RRFB installation.
Teaming and subs
  • Consider partnering with local electrical contractors.
  • Collaborate with traffic engineering consultants if necessary.
Risks and watchouts
  • Potential delays due to regulatory approvals.
  • Challenges in sourcing materials or equipment on time.
  • Misalignment between project scope and contractor capabilities.
Smart questions to ask
  • What are the project specific safety requirements?
  • Are there preferred manufacturers or suppliers for RRFB components?
  • What are the expectations for project completion timelines?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project specifications and scope.
  • Potential budget limitations from the agency.
  • Information on any required permits or local regulations.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.