Skip to content
City of Eugene

2026 ITB 3 Delta Ponds Trail Extension - Vegetation Enhancement

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KE0010-00015804

Federal opportunity from KE001004 - Engineering | KE001 - Engineering • City of Eugene. Place of performance: OR. Response deadline: Feb 03, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,224,714,355
Sector total $7,224,714,355 • Share 100.0%
Live
Median
$252,161
P10–P90
$30,768$1,428,923
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,224,714,355)
Deal sizing
$252,161 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
Milissa Bateman 180 W 8th Avenue, Suite 200 Eugene, OR 97401 US Email: mbateman@eugene-or.gov Phone: (541) 682-8305
State: OR
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260001 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
+46 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 46 more rate previews.
Davis-BaconBest fitstate match
OR20260001 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Benton, Clackamas +33
Rate
BRICKLAYER
Base $49.60Fringe $25.15
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
Piledriver
Base $55.79Fringe $15.81
+45 more occupation rates in this WD
Davis-Baconstate match
OR20260009 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Crook, Gilliam +4
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Eugene
Agency
KE001004 - Engineering | KE001 - Engineering
Subagency
KE001004 - Engineering | KE001 - Engineering
Office
Milissa Bateman | mbateman@eugene-or.gov | (541) 682-8305
Contracting Office Address
Not available

Description

2026 ITB 3 Delta Ponds Trail Extension - Vegetation Enhancement

The scope of work for this contract includes: Site Preparation; Planting & Mulching; Two years of vegetation establishment, including temporary watering.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The 2026 ITB 3 Delta Ponds Trail Extension - Vegetation Enhancement contract seeks to improve local ecosystems through designated vegetation initiatives. The project involves site preparation, planting, mulching, and a two-year vegetation establishment phase, which includes temporary watering to ensure growth. Bidders should be prepared for a response deadline set for February 3, 2026.

Vegetation EnhancementSite PreparationPlanting and Mulching
What the buyer is trying to do

The buyer aims to enhance the Delta Ponds Trail by supporting vegetation growth and sustainability through well-planned site preparation and maintenance activities.

Who should pursue this
  • Environmental engineering firms
  • Landscape contractors
  • Companies experienced in vegetation establishment
Work breakdown
  • Site Preparation
  • Planting & Mulching
  • Two years of vegetation establishment
  • Temporary watering during establishment phase
Response package checklist
  • Completed bid submission form
  • Qualifications and experience documentation
  • Proposed timeline for each phase
  • Cost breakdown for labor and materials
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Adherence to environmental regulations during planting
  • Need for irrigation equipment for temporary watering
Pricing strategy
  • Consider pricing for long-term maintenance over two years
  • Include cost for potential plant replacement due to failure
Teaming and subs
  • Subcontractors for specialized planting techniques
  • Local nurseries for sourcing native plants
Risks and watchouts
  • Weather conditions affecting planting schedule
  • Potential for invasive species intermingling with intended vegetation
  • Long-term maintenance costs may exceed estimates
Smart questions to ask
  • What specific plant species are required or preferred?
  • Are there any local environmental regulations to consider?
  • What are the criteria for measuring vegetation success?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific location details of Delta Ponds
  • Exact funding allocation for the project
  • Local regulatory requirements
  • Types of vegetation to be established
  • Bid submission format specifics

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.