2025 ITB 8 East 24th Avenue, Hilyard Street & Alder Street Paving
Federal opportunity from KE001004 - Engineering | KE001 - Engineering • City of Eugene. Place of performance: OR. Response deadline: Jun 18, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
2025 ITB 8 East 24th Avenue, Hilyard Street & Alder Street Paving The scope of work generally includes: Cold plane pavement removal of existing asphalt surfaces; Asphalt paving; Roadway reconstruction and full depth reclamation; Wastewater pipe repairs, storm water structure and pipe repairs; Temporary pedestrian access and traffic control; Construction of concrete sidewalk and curb ramps; Multi-use path construction; Lighting; Traffic calming; Traffic signal modification; Striping/Signing
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.