ITB 20252040 Concourse A Asphalt Apron Rehabilitation
Federal opportunity from KE001007 - Purchasing | 001 - MHPurchasing • City of Eugene. Place of performance: OR. Response deadline: Apr 24, 2025.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ITB 20252040 Concourse A Asphalt Apron Rehabilitation In general, the project involves an asphalt mill and asphalt overlay of the existing terminal apron surrounding Concourse A at the Eugene Airport. Additional scope items include the demolition and installation of drainage structures within the apron as well as limited electrical infrastructure improvements. The project will be federally funded and/or may be subject to availability of federal funds. In general, the project involves an asphalt mill and asphalt overlay of the existing terminal apron surrounding Concourse A at the Eugene Airport. Additional scope items include the demolition and installation of drainage structures within the apron as well as limited electrical infrastructure improvements.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.