Skip to content
City of Eugene

ITB 20252040 Concourse A Asphalt Apron Rehabilitation

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KE0010-00013376

Federal opportunity from KE001007 - Purchasing | 001 - MHPurchasing • City of Eugene. Place of performance: OR. Response deadline: Apr 24, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$964,691,384
Sector total $964,691,384 • Share 100.0%
Live
Median
$107,325
P10–P90
$28,414$4,168,590
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($964,691,384)
Deal sizing
$107,325 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
Michelle Hahn 500 E. 4th Avenue, Suite 303 Eugene, OR 97401 US Email: MHahn@eugene-or.gov Phone: (541) 682-5051
State: OR
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
City of Eugene
Agency
KE001007 - Purchasing | 001 - MHPurchasing
Subagency
KE001007 - Purchasing | 001 - MHPurchasing
Office
Michelle Hahn | MHahn@eugene-or.gov | (541) 682-5051
Contracting Office Address
Not available

Description

ITB 20252040 Concourse A Asphalt Apron Rehabilitation In general, the project involves an asphalt mill and asphalt overlay of the existing terminal apron surrounding Concourse A at the Eugene Airport. Additional scope items include the demolition and installation of drainage structures within the apron as well as limited electrical infrastructure improvements. The project will be federally funded and/or may be subject to availability of federal funds. In general, the project involves an asphalt mill and asphalt overlay of the existing terminal apron surrounding Concourse A at the Eugene Airport. Additional scope items include the demolition and installation of drainage structures within the apron as well as limited electrical infrastructure improvements.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.