2024 ITB 3 Wastewater Rehabilitation Harlow Laterals
Federal opportunity from KE001004 - Engineering | KE001 - Engineering • City of Eugene. Place of performance: OR. Response deadline: Apr 04, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
2024 ITB 3 Wastewater Rehabilitation Harlow Laterals The scope of work generally includes: Installation of CIPP liners in wastewater service laterals; Installation of connection liners at junction between wastewater mainline and service laterals; Video inspection and locating of wastewater service laterals; Temporary pedestrian and traffic control
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.