ITB 25 West Irwin Pump Station Replacement
Federal opportunity from KE001004 - Engineering | KE001 - Engineering • City of Eugene. Place of performance: OR. Response deadline: Nov 29, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ITB 25 West Irwin Pump Station Replacement The scope of work includes: Installing and operating a temporary bypass pumping system. Demolishing and salvaging existing pump station facilities and equipment. Converting the existing caisson into a wet well. Furnishing and installing five submersible pumps, associated piping, three buried concrete vaults, and electrical and instrumentation equipment. Constructing a new above-ground building. Site grading, paving, and grasscrete surfacing construction. Facility startup and testing.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.