2023 ITB 21 Oak Street and Pearl Street Paving
Federal opportunity from KE001004 - Engineering | KE001 - Engineering • City of Eugene. Place of performance: OR. Response deadline: Sep 19, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
2023 ITB 21 Oak Street and Pearl Street Paving The scope of work for this contract includes: Cold plane removal of existing asphalt surface on Oak St from 13th Ave to 7th Ave; Concrete panel replacement from on Oak St from 17th Ave to 13th Ave; Cold plane removal of existing asphalt surface on Pearl St from 17th Ave to East Broadway; Concrete intersection replacement of Oak St and 15th Ave; Storm water structure modifications and stormwater pipe installation; Temporary and permanent pedestrian and traffic control.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.