RFQ 2023200054 Arc Flash Study, Incident Energy Analysis and Short Circuit Study
Federal opportunity from KE001003 - Wastewater | KE001 - Wastewater • City of Eugene. Place of performance: OR. Response deadline: Mar 13, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
RFQ 2023200054 Arc Flash Study, Incident Energy Analysis and Short Circuit Study In general, work includes performing an Arc Flash Study, Incident Energy Analysis and Short Circuit Study on all electrical equipment rated 50V or above on the 92-acre Regional Wastewater Treatment Facility at 410 River Avenue Eugene, Oregon and at 3050 Goodpasture Lakes Loop, Eugene, OR 97401 in accordance with OSHA 29 CFR 1910 and NFPA 70E Arc Flash Study, Incident Energy Analysis and Short Circuit Study on all electrical equipment rated 50V or above on the 92-acre Regional Wastewater Treatment Facility at 410 River Avenue Eugene, Oregon and at 3050 Goodpasture Lakes Loop, Eugene, OR 97401 in accordance with OSHA 29 CFR 1910 and NFPA 70E..
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.