2023 ITB 3 High Street Protected Bikeway
Federal opportunity from KE001004 - Engineering | KE001 - Engineering • City of Eugene. Place of performance: OR. Response deadline: Feb 28, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
2023 ITB 3 High Street Protected Bikeway The scope of work for this contract includes: Concrete sidewalk and sidewalk ramps; Asphalt pavement repairs; Concrete traffic separator curb; Permanent pavement markings and signs; Permanent traffic signalization; Permanent lighting; Permanent landscaping repair; Temporary pedestrian and traffic control; Temporary erosion control.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.