RFQ 2022200088 Cracked Beam Repair at 77 North Garfield
Federal opportunity from City of Eugene. Place of performance: OR. Response deadline: Sep 15, 2022.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 46 more rate previews.↓
Point of Contact
Agency & Office
Description
RFQ 2022200088 Cracked Beam Repair at 77 North Garfield
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The City of Eugene has issued RFQ 2022200088 for a Cracked Beam Repair at 77 North Garfield. The response deadline is set for September 15, 2022. This opportunity is crucial for contractors with experience in structural repairs and relevant licenses.
The City is seeking qualified contractors to perform repair services on a cracked beam, ensuring safety and structural integrity at the specified location.
- Contractors specializing in structural repairs
- Construction firms with prior experience in municipal projects
- Licensed and bonded construction companies
- Assessment of the cracked beam condition
- Preparation of repair plan
- Execution of structural repairs
- Final inspection and documentation
- Completed bid form
- Evidence of relevant experience
- Licenses and certifications
- Proof of insurance
- Detailed pricing breakdown
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Bids must comply with local codes and regulations
- Contractors must be licensed in the state of Oregon
- Consider competitive pricing while reflecting quality of work
- Pricing should include all necessary materials and labor costs
- Look for experienced subcontractors for specialized tasks such as engineering assessments
- Collaborate with local suppliers for materials
- Potential delays in material procurement
- Weather-related disruptions during repairs
- Regulatory compliance issues
- What is the expected timeline for the repair work?
- Are there any specific local codes that need to be followed?
- Is there existing documentation on the current condition of the beam?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Estimated budget for the project
- Detailed specifications for the repair requirements
- Information about site access
- Current structural assessments
- Any required pre-bid meetings or site visits
- Regulatory permits required
- Past similar projects completed by the agency
- Potential penalties for delays
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.