Skip to content
City of Eugene

ITB 2022200034 Installation of Wayfinding Signs

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KE0010-00001489
DepartmentCity of EugeneStateORPostedDueJan 12, 2022, 02:30 PM UTCExpired

Federal opportunity from City of Eugene. Place of performance: OR. Response deadline: Jan 12, 2022.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Eugene
Agency
Not available
Subagency
Not available
Office
Shawn Hubbell
Contracting Office Address
Not available

Description

ITB 2022200034 Installation of Wayfinding Signs

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 23, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Eugene is seeking bids for the installation of wayfinding signs under ITB 2022200034. The response deadline for submissions is January 12, 2022, at 2:30 PM. This project aims to enhance navigation and accessibility within the city, providing a significant opportunity for qualified contractors specializing in sign installation and related services.

wayfinding signsmunicipal signagesign installationCity of Eugenepublic navigation
What the buyer is trying to do

The City of Eugene aims to improve public navigation and enhance local tourism through the installation of wayfinding signs throughout the city.

Who should pursue this
  • Companies with experience in sign installation
  • Firms with a track record of municipal contracts
  • Subcontractors with expertise in navigational signage
Work breakdown
  • Assess locations for installation
  • Design and manufacture signs
  • Install signs according to city specifications
  • Conduct post-installation review for compliance
Response package checklist
  • Completed bid form
  • List of relevant project experience
  • Company qualifications
  • Proposed project schedule
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • All installations must comply with city regulations
  • Signage must meet ADA standards for accessibility
Pricing strategy
  • Consider materials and fabrication costs
  • Account for labor and installation time
  • Evaluate potential for additional maintenance contracts
Teaming and subs
  • Partnerships with local sign manufacturers
  • Use of subcontractors specializing in installation
  • Collaboration with design firms for sign graphics
Risks and watchouts
  • Potential local regulations affecting sign visibility
  • Weather conditions impacting the installation timeline
  • Project delays due to unforeseen site conditions
Smart questions to ask
  • What specific locations are prioritized for sign installation?
  • Are there any existing sign specifications or guidelines to follow?
  • What budget limitations does the City of Eugene have for this project?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed project specifications
  • Specific locations for sign installation
  • Budget estimate for the project
  • List of relevant city regulations
  • Clarification on maintenance responsibilities
  • How the city will assess vendor qualifications
  • Any required warranties for installed signs
  • Information on potential future phases

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.