ITB 24-081 FY 24-25 Concrete Road Repair Contract
Federal opportunity from KB002001 - Finance | KB002 - Procurement • City of Beaverton. Place of performance: OR. Response deadline: May 14, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ITB 24-081 FY 24-25 Concrete Road Repair Contract This project consists of the removal of 2179 SY of 8 to 10-inch dowelled concrete roadway, 2179 SY of 12-inch subgrade stabilization (estimated 910 tons of 3/4 minus), and placement 2179 SY of 10-inch dowelled concrete roadway. The work will take place on a mixture of Collector and Residential roadways. The project cost is estimated to be between $600,000 and $650,000.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.