Skip to content
City of Beaverton

ITB for Construction of ADA Curb Ramp Retrofit Upgrade Project

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KB0020-00006441
DepartmentCity of BeavertonStateORPostedDueApr 27, 2023, 02:00 PM UTCExpired

Federal opportunity from City of Beaverton. Place of performance: OR. Response deadline: Apr 27, 2023.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,275,750,127
Sector total $2,275,750,127 • Share 100.0%
Live
Median
$146,315
P10–P90
$27,574$1,433,570
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,275,750,127)
Deal sizing
$146,315 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260080 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Baker, Crook, Gilliam +5
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (Excluding Form Work)
Base $53.94Fringe $16.81
+36 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 36 more rate previews.
Davis-BaconBest fitstate match
OR20260080 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Baker, Crook, Gilliam +5
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (Excluding Form Work)
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $63.50Fringe $29.73
+35 more occupation rates in this WD
Davis-Baconstate match
OR20260056 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Jackson
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+32 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Beaverton
Agency
Not available
Subagency
Not available
Office
Michael Phillips
Contracting Office Address
Not available

Description

ITB for Construction of ADA Curb Ramp Retrofit Upgrade Project

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The City of Beaverton is seeking bids for the construction of an ADA Curb Ramp Retrofit Upgrade Project, which highlights its commitment to accessibility improvements. Bids are due by April 27, 2023, at 14:00 UTC. This opportunity presents a specific focus on compliance with ADA standards and enhancing public infrastructure.

ADA complianceCurb ramp upgradePublic works constructionBeaverton construction projectsAccessibility improvements
What the buyer is trying to do

The City of Beaverton aims to upgrade existing curb ramps to meet ADA requirements, ensuring accessibility for all individuals, particularly those with disabilities.

Who should pursue this
  • Construction firms with experience in ADA compliance
  • General contractors familiar with public infrastructure projects
  • Companies located in or near Beaverton, Oregon
Work breakdown
  • Site assessment and planning
  • Demolition of existing curb ramps
  • Construction of new ADA-compliant curb ramps
  • Quality assurance and compliance checks
  • Final inspection and project closeout
Response package checklist
  • Completed bid form
  • Proof of experience in similar projects
  • List of references
  • Cost proposal
  • Project schedule
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Must comply with ADA standards
  • Firms must demonstrate past performance in similar retrofit projects
Pricing strategy
  • Competitive pricing is essential due to multiple bidders expected
  • Consider potential costs for materials and labor in Beaverton
Teaming and subs
  • Consider teaming with local subcontractors who have ADA experience
  • Explore partnerships with firms specialized in public works projects
Risks and watchouts
  • Regulatory non-compliance with ADA standards could lead to disqualification
  • Potential for project delays due to unforeseen site conditions
  • Underestimating costs could impact profitability
Smart questions to ask
  • What specific ADA standards need to be adhered to?
  • Are there any existing site conditions that could affect the project?
  • Who will be responsible for inspections during the construction process?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed bid documents are not provided
  • Lack of specific budget range
  • No background information on previous projects or contractors
  • No information on funding sources or budget allocation
  • Unclear about potential site challenges or conditions
  • Limited details on bonding or insurance requirements
  • No list of required permits or licenses
  • Absence of information on maintenance responsibilities post-construction

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.