3980-23 ITB for the Construction of SW Wilson Ct (Kimberly ? Hart) Waterline Replacement
Federal opportunity from KB002001 - Finance | KB002 - Procurement • City of Beaverton. Place of performance: OR. Response deadline: Feb 14, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
3980-23 ITB for the Construction of SW Wilson Ct (Kimberly ? Hart) Waterline Replacement The City of Beaverton is accepting will only accept electronic bids for the project, SW Wilson Ct, Kimberly- Hart, Waterline Replacement, Project No. 3980-23. https://bidlocker.us/details/3291_Sw_Wilson_Ct_Kimberly_Hart_Waterline_Replacement The project consists of the installation of approximately 797 lineal feet of 6 in. diameter, 569 lineal feet of 8 in. diameter, and 440 lineal feet of 12 in. diameter new water main, with 33 water services, 3 hydrants, 1 CARV, and associated valves and structures. The project cost is approximately between $1,000,000 and $1,300,000.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.