Skip to content
City of Beaverton

3884-22 RFQ Architectural and Urban Design Services

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KB0020-00001868
DepartmentCity of BeavertonStateORPostedDueFeb 10, 2022, 02:00 PM UTCExpired

Federal opportunity from City of Beaverton. Place of performance: OR. Response deadline: Feb 10, 2022.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,205,695,420
Sector total $7,205,695,420 • Share 100.0%
Live
Median
$96,720
P10–P90
$28,298$2,037,759
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,205,695,420)
Deal sizing
$96,720 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260006 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
Rate
GROUP 3
Base $53.60Fringe $16.90
+15 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
City of Beaverton
Agency
Not available
Subagency
Not available
Office
Marybeth Sumner
Contracting Office Address
Not available

Description

3884-22 RFQ Architectural and Urban Design Services

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 23, 2026
Client-ready brief
Executive summary
low confidencegpt 5.2

The City of Beaverton issued an RFQ titled “3884-22 RFQ Architectural and Urban Design Services” (notice_id: state_or_oregonbuys__S-KB0020-00001868). The opportunity appears to seek qualifications for architectural and urban design services, but no scope details, submission instructions, or attachments are provided in the brief. The response deadline is 2022-02-10 at 14:00 UTC, so this is likely already closed unless the buyer reissued or extended it. If you plan to pursue similar City of Beaverton design RFQs, the immediate priority is to obtain the full RFQ document to confirm required disciplines, evaluation factors, and submission format.

City of Beaverton3884-22RFQArchitecturalUrban DesignStatement of QualificationsSOQ
What the buyer is trying to do

Establish a qualified provider (or pool) for architectural and urban design services for the City of Beaverton via an RFQ process.

Who should pursue this
  • Architecture firms with demonstrated municipal/public-sector project experience and strong urban design capability.
  • Urban design/planning practices that can lead or support an architectural team for city-led planning/design initiatives.
  • Multidisciplinary A/E teams able to integrate architecture and urban design services for a city client (City of Beaverton).
Work breakdown
  • Review and confirm full RFQ requirements for “3884-22 RFQ Architectural and Urban Design Services” (scope, deliverables, evaluation, instructions).
  • Prepare qualifications package highlighting relevant architectural and urban design experience, approach, and team capabilities aligned to City of Beaverton needs.
  • Assemble team and demonstrate capacity (key personnel, resumes, project sheets, and availability) for architectural and urban design services.
  • Submit RFQ response by 2022-02-10 14:00 UTC (only if a valid extension/reissue is confirmed).
Response package checklist
  • RFQ response/statement of qualifications for “3884-22 RFQ Architectural and Urban Design Services”.
  • Cover letter referencing the RFQ title and City of Beaverton.
  • Firm overview and relevant project experience in architectural and urban design services.
  • Key personnel list and resumes (architecture + urban design).
  • Project sheets/case studies demonstrating comparable work (municipal/city context if applicable).
  • Team organization chart and roles (prime/subconsultants if used).
  • Any required forms/certifications as specified in the full RFQ (not included in the brief).
  • Submission confirmation aligned to the stated deadline: 2022-02-10 14:00 UTC.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • The brief provides only the RFQ title/description and a deadline; obtain the full RFQ document to confirm mandatory forms, page limits, file format, and delivery method.
  • Validate whether the 2022-02-10 deadline is still actionable (this appears historic).
Pricing strategy
  • As an RFQ for qualifications, pricing may be minimal or not requested; confirm in the full RFQ whether fees/rate schedules are required.
  • If rates are requested, consider presenting transparent rate structures tied to architectural and urban design labor categories and a clear approach to scoping/budget control for city work (only if allowed by the RFQ instructions).
Teaming and subs
  • Consider teaming architecture + urban design to present a cohesive qualifications story; confirm whether the City of Beaverton expects additional disciplines (not stated in the brief).
  • If your core strength is architecture, add an urban design specialist as a subconsultant (or vice versa) to match the RFQ’s combined focus.
Risks and watchouts
  • Insufficient information in the notice brief: without attachments/links, key compliance items (submission format, evaluation criteria, required forms) are unknown and could cause disqualification.
  • The stated response deadline (2022-02-10 14:00 UTC) suggests the opportunity may be closed; bidding without confirming status could waste effort.
  • Ambiguity on scope: “Architectural and Urban Design Services” could mean on-call services, a specific project, or a multi-award bench—each requires different positioning.
Smart questions to ask
  • Is this RFQ still active, reissued, or has it been replaced since the 2022-02-10 deadline?
  • Is the City of Beaverton seeking an on-call/IDIQ-style roster or qualifications for a single defined project?
  • What are the required submission components (page limits, number of references/projects, formatting, and delivery platform)?
  • What evaluation criteria will the City of Beaverton use for selection (experience, team, approach, capacity, local knowledge, etc.)?
  • Are subconsultants allowed/expected, and are there required disciplines beyond architecture and urban design?
  • Are there any mandatory forms, certifications, or insurance requirements that must be included with the SOQ?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Full RFQ document/attachments and submission instructions
  • Confirmation whether the RFQ is still active given the 2022-02-10 deadline
  • Defined scope (on-call vs single project), deliverables, and expected disciplines
  • Evaluation criteria and selection process details
  • Submission format requirements (page limits, file type, delivery method)
  • Any required forms, certifications, and insurance requirements
  • NAICS/PSC codes and any set-aside or eligibility constraints
  • Place of performance and period of performance

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.