Skip to content
City of Ashland

Briscoe School roof replacement

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-KA0010-00007086

Federal opportunity from KA001006 - Public Works | KA001 - Public Works • City of Ashland. Place of performance: OR. Response deadline: Jun 22, 2023.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$546,655,675
Sector total $546,655,675 • Share 100.0%
Live
Median
$97,181
P10–P90
$33,967$992,402
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($546,655,675)
Deal sizing
$97,181 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for OR
Live POP
Place of performance
Tami De Mille-Campos 51 Winburn Way Ashland, OR 97520 US Email: Phone: (541) 552-2420
State: OR
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
City of Ashland
Agency
KA001006 - Public Works | KA001 - Public Works
Subagency
KA001006 - Public Works | KA001 - Public Works
Office
Tami De Mille-Campos | Phone: | (541) 552-2420
Contracting Office Address
Not available

Description

Briscoe School roof replacement Roofing Addendum 2 p.4, Invitation to Bid. Paragraph 1 – Change time and location of bid opening to 3:00 pm June 22nd in the Lithia Conference Room of the Community Development Building at 51 Winburn Way, Ashland, Oregon. Section 4.2.5 Add new subsection 4.2.5.g to read as follows: Roofing Liability. Time is of the essence to make the Briscoe School watertight once the roof has been removed. In addition to Contractor's obligations set forth in Section 27 of Exhibit A to the “Public Improvement Contract for Project 2019-27: Briscoe School Roof Replacement,” Contractor shall take all precaution to minimize exposure time between roof removal and roof installation. Contractor is responsible for any rain damage to occur to Briscoe School as a result of Contractor’s failure to take precautionary steps, which include but are not limited to, the timely ordering of material, proper scheduling of personnel, scheduling coordination with the asbestos abatement contractors, and the use of temporary roofing material in the event of a predicted rainstorm.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.