RFI 25-0009 Barnes ES Cafeteria/Gym Design-Build
Federal opportunity from P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept • Beaverton School District #48J. Place of performance: OR. Response deadline: Nov 04, 2025.
Support routes that fit this solicitation
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 30 more rate previews.↓
Point of Contact
Agency & Office
Description
RFI 25-0009 Barnes ES Cafeteria/Gym Design-Build
The purpose of this Request for Information is to obtain feedback from our industry partners about a K-12 design-build solicitation. This feedback will be considered and may or may not be included in the RFQ/RFP.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The State of Oregon's Facilities Development Department is issuing RFI 25-0009 for the Barnes Elementary School Cafeteria/Gym Design-Build project. The RFI aims to gather insights from industry partners on a K-12 design-build solicitation. Feedback obtained may influence the forthcoming RFQ/RFP, making participation crucial for interested parties.
The buyer seeks to collect valuable feedback from potential contractors regarding the design-build process for the Barnes ES Cafeteria/Gym project. This engagement is intended to refine project specifications and requirements before issuing a formal solicitation.
- Design-build firms experienced in K-12 projects
- Architectural and engineering firms specializing in educational facilities
- General contractors with a strong track record in similar projects
- Assess design-build industry standards and best practices for K-12 environments
- Evaluate construction materials and methods appropriate for school facilities
- Identify potential challenges in the design and construction phases
- Company profile including relevant project experience
- Feedback on potential design-build challenges and solutions
- Suggestions for project timeline and delivery methods
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure feedback adheres to the specifications outlined in the RFI
- Responses must be submitted before the deadline of November 4, 2025
- Consider competitive pricing aligned with K-12 project benchmarks
- Incorporate efficient resource allocation to optimize costs
- Collaborating with local subcontractors familiar with school district requirements
- Partnerships with specialized consultants for educational facility design
- Potential changes in project requirements after RFI responses
- Uncertainty in how feedback will impact final RFQ/RFP details
- What specific design features are prioritized for this K-12 project?
- How much weight will the feedback from this RFI carry in the final solicitation?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific criteria for feedback submission
- No details on the budget for the project
- Lack of information regarding the scope of the design work
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.