Skip to content
Beaverton School District #48J

RFI 25-0009 Barnes ES Cafeteria/Gym Design-Build

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P34048-00015223

Federal opportunity from P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept • Beaverton School District #48J. Place of performance: OR. Response deadline: Nov 04, 2025.

Federal Bid Partners service match

Support routes that fit this solicitation

Need help writing this bid?
Route this notice into Federal Bid Partners proposal lanes and align it with the right plan, compliance support, and submission workflow.
Open proposal plans

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$2,706,841,172
Sector total $2,706,841,172 • Share 100.0%
Live
Median
$318,072
P10–P90
$42,300$2,065,904
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($2,706,841,172)
Deal sizing
$318,072 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260071 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Klamath
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (Excluding Form Work)
Base $53.94Fringe $16.81
+30 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 30 more rate previews.
Davis-BaconBest fitstate match
OR20260071 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Klamath
Rate
MILLWRIGHT
Base $59.35Fringe $22.38
Rate
CARPENTER (Excluding Form Work)
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260007 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Klamath
Rate
Carpenters: Including Form Work-Multi Unit
Base $36.27Fringe $14.03
Rate
Including Form Work-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Beaverton School District #48J
Agency
P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept
Subagency
P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept
Office
Elizabeth Smith
Contracting Office Address
Not available

Description

RFI 25-0009 Barnes ES Cafeteria/Gym Design-Build

The purpose of this Request for Information is to obtain feedback from our industry partners about a K-12 design-build solicitation. This feedback will be considered and may or may not be included in the RFQ/RFP.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 02, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The State of Oregon's Facilities Development Department is issuing RFI 25-0009 for the Barnes Elementary School Cafeteria/Gym Design-Build project. The RFI aims to gather insights from industry partners on a K-12 design-build solicitation. Feedback obtained may influence the forthcoming RFQ/RFP, making participation crucial for interested parties.

design-buildK-12 educationBarnes Elementaryfacility designconstruction standards
What the buyer is trying to do

The buyer seeks to collect valuable feedback from potential contractors regarding the design-build process for the Barnes ES Cafeteria/Gym project. This engagement is intended to refine project specifications and requirements before issuing a formal solicitation.

Who should pursue this
  • Design-build firms experienced in K-12 projects
  • Architectural and engineering firms specializing in educational facilities
  • General contractors with a strong track record in similar projects
Work breakdown
  • Assess design-build industry standards and best practices for K-12 environments
  • Evaluate construction materials and methods appropriate for school facilities
  • Identify potential challenges in the design and construction phases
Response package checklist
  • Company profile including relevant project experience
  • Feedback on potential design-build challenges and solutions
  • Suggestions for project timeline and delivery methods
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure feedback adheres to the specifications outlined in the RFI
  • Responses must be submitted before the deadline of November 4, 2025
Pricing strategy
  • Consider competitive pricing aligned with K-12 project benchmarks
  • Incorporate efficient resource allocation to optimize costs
Teaming and subs
  • Collaborating with local subcontractors familiar with school district requirements
  • Partnerships with specialized consultants for educational facility design
Risks and watchouts
  • Potential changes in project requirements after RFI responses
  • Uncertainty in how feedback will impact final RFQ/RFP details
Smart questions to ask
  • What specific design features are prioritized for this K-12 project?
  • How much weight will the feedback from this RFI carry in the final solicitation?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Specific criteria for feedback submission
  • No details on the budget for the project
  • Lack of information regarding the scope of the design work

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.