Skip to content
Beaverton School District #48J

ITB 25-0007 Southridge High School Flooring Replacement

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P34048-00015079
DepartmentBeaverton School District #48JStateORPostedDueNov 18, 2025, 02:00 PM UTCExpired

Federal opportunity from Beaverton School District #48J. Place of performance: OR. Response deadline: Nov 18, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$88,279,495,882
Sector total $88,279,495,882 • Share 100.0%
Live
Median
$313,578
P10–P90
$29,347$18,600,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($88,279,495,882)
Deal sizing
$313,578 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
Beaverton School District #48J
Agency
Not available
Subagency
Not available
Office
Marcos Campuzano Olvera
Contracting Office Address
Not available

Description

ITB 25-0007 Southridge High School Flooring Replacement

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 23, 2026
Executive summary

The Beaverton School District #48J has issued an Invitation to Bid (ITB 25-0007) for the Southridge High School Flooring Replacement project. Bids are due by November 18, 2025, and contractors with expertise in educational facility renovations will find this opportunity to align well with their capabilities. The project offers a significant chance for contractors in the flooring industry to contribute to the enhancement of a local educational institution.

What the buyer is trying to do

The Beaverton School District aims to replace the flooring at Southridge High School to improve safety and aesthetics, ultimately enhancing the learning environment for students.

Work breakdown
  • Assess existing flooring conditions
  • Remove existing flooring
  • Install new flooring materials
  • Conduct inspections and quality assurance
Response package checklist
  • Completed bid form
  • Company qualifications
  • Detailed project approach
  • Cost estimate
  • Proposed timeline
Suggested keywords
flooring replacementeducational renovationBeaverton School DistrictITBconstruction bid
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No information on specific flooring materials required
  • No budget estimate available
  • No previous contractor performance data provided
  • No site visit details included
  • Lack of requirements for sustainability standards
  • No outlined penalties for non-compliance
  • No detailed timeline aside from bid deadline

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.