Skip to content
Beaverton School District #48J

ITB 25-0008 Cooper Mountain ES Canopy

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P34048-00015073

Federal opportunity from P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept • Beaverton School District #48J. Place of performance: OR. Response deadline: Oct 23, 2025.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$88,279,495,882
Sector total $88,279,495,882 • Share 100.0%
Live
Median
$313,578
P10–P90
$29,347$18,600,000
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($88,279,495,882)
Deal sizing
$313,578 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
Beaverton School District #48J
Agency
P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept
Subagency
P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept
Office
Elizabeth Smith
Contracting Office Address
Not available

Description

ITB 25-0008 Cooper Mountain ES Canopy The purpose of this Invitation to Bid is to obtain competitive bids for a General Contractor to provide all labor, tools and materials to furnish, install, manage and coordinate the work for a concrete slab and covered structure at Cooper Mountain Elementary School.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 22, 2026
Executive summary

The ITB 25-0008 seeks competitive bids for constructing a canopy at Cooper Mountain Elementary School. The selected General Contractor will be responsible for all labor, tools, and materials needed to install a concrete slab and covered structure. The bid deadline is set for October 23, 2025, making it essential for interested contractors to prepare their proposals promptly.

What the buyer is trying to do

The buyer aims to procure a General Contractor to manage and execute the installation of necessary structures at the school, ensuring completion within the stipulated timeline.

Work breakdown
  • Furnish materials for the concrete slab
  • Install the concrete slab
  • Construct and install the covered structure
  • Manage project coordination and scheduling
  • Ensure compliance with all applicable codes and standards
Response package checklist
  • Completed bid forms
  • Proof of previous relevant work
  • References from past clients
  • Licenses and certifications
  • Proof of insurance coverage
Suggested keywords
General ContractorConcrete InstallationEducational FacilityCanopy ConstructionUS State Procurement
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Exact location details of Cooper Mountain Elementary School
  • Clarification on required project timelines
  • Any specific materials that are preferred or prohibited
  • Information regarding existing site conditions affecting the work
  • Details on the evaluation criteria for bids

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.