23-0030 Pre-K Playground Site Work
Federal opportunity from P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept • Beaverton School District #48J. Place of performance: OR. Response deadline: May 02, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
23-0030 Pre-K Playground Site Work The purpose of this Invitation to Bid is to obtain competitive bids for a General Contractor to provide all labor, tools and materials for site work construction at Elmonica Elementary School and Fir Grove Elementary School. The site work construction at each school is to prepare for installation of pre-k playground equipment and playground turf surface.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.