ITB 23-0006 Stoller Middle School Freezer Replacement
Federal opportunity from P3404803 - Facilities Maintenance | P3404 - Facilities Maint • Beaverton School District #48J. Place of performance: OR. Response deadline: Mar 05, 2024.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ITB 23-0006 Stoller Middle School Freezer Replacement The goal is to replace the existing walk-in freezer / cooler. The selected Contractor shall provide all work required to complete the work over the summer break after the 2023 / 24 school year. This solicitation is to establish a Contract with the selected General Contractor to furnish all labor, materials, equipment, transportation and other services as necessary and / or required to execute all the work as shown in the attached documents on behalf of the Beaverton School District. The goal is to replace the existing walk-in freezer / cooler. The selected Contractor shall provide all work required to complete the work over the summer break after the 2023 / 24 school year.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.