Skip to content
Beaverton School District #48J

ITB 22-0034 District Administration Office- Tenant Improvements

Solicitation: Not available
Notice ID: state_or_oregonbuys__S-P34048-00006921

Federal opportunity from P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept • Beaverton School District #48J. Place of performance: OR. Response deadline: Jun 08, 2023.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$7,094,851,529
Sector total $7,094,851,529 • Share 100.0%
Live
Median
$229,838
P10–P90
$30,957$1,277,308
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($7,094,851,529)
Deal sizing
$229,838 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
OR20260070 (Rev 1)
Match signal: state matchOpen WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
+29 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 29 more rate previews.
Davis-BaconBest fitstate match
OR20260070 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Josephine
Rate
Carpenters: Including Form Work
Base $53.94Fringe $16.81
Rate
ELECTRICIAN
Base $47.04Fringe $21.84
Rate
POWER EQUIPMENT OPERATOR GROUP 1
Base $56.66Fringe $16.90
+28 more occupation rates in this WD
Davis-Baconstate match
OR20260011 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Lake, Malheur, Morrow +6
Rate
Carpenters: Form Work Only-Multi Unit
Base $36.27Fringe $14.03
Rate
Form Work Only-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $41.67Fringe $19.08
+20 more occupation rates in this WD
Davis-Baconstate match
OR20260005 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Douglas
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
Rate
ELECTRICIAN
Base $39.34Fringe $22.45
Rate
POWER EQUIPMENT OPERATOR GROUP 2
Base $54.75Fringe $16.90
+16 more occupation rates in this WD
Davis-Baconstate match
OR20260007 (Rev 1)
Open WD
Published Jan 23, 2026Oregon • Klamath
Rate
Carpenters: Including Form Work-Multi Unit
Base $36.27Fringe $14.03
Rate
Including Form Work-Single Unit
Base $33.48Fringe $14.03
Rate
ELECTRICIAN
Base $33.41Fringe $18.20
+16 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Beaverton School District #48J
Agency
P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept
Subagency
P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept
Office
Elizabeth Smith
Contracting Office Address
Not available

Description

ITB 22-0034 District Administration Office- Tenant Improvements

A NON-MANDATORY pre-Bid conference will be held on May 18, 2023 at 10:00 AM Pacific Time at 1260 NW Waterhouse Avenue, Beaverton, OR 97219.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 21, 2026
Client-ready brief
Executive summary
high confidencegpt 4o mini

The opportunity involves tenant improvements at the District Administration Office under solicitation ITB 22-0034. A non-mandatory pre-bid conference is set for May 18, 2023, which allows bidders to gain insights about project requirements. The response deadline is June 8, 2023, at 14:00 PM PT, necessitating thorough preparation and adherence to project specifications.

tenant improvementsbid conferenceconstruction renovationDistrict Administration OfficeBeaverton, OR
What the buyer is trying to do

The buyer aims to renovate and improve the existing District Administration Office facilities in Beaverton, OR, to enhance functionality and aesthetic appeal.

Who should pursue this
  • Construction firms specializing in tenant improvements.
  • Contractors with experience in office renovations and upgrades.
  • Local businesses within or near Beaverton, OR.
Work breakdown
  • Review bid documents and specifications available through provided links.
  • Attend the pre-bid conference on May 18, 2023, for clarifications.
  • Prepare and submit bid proposal by June 8, 2023, 14:00 PM PT.
  • Ensure compliance with state regulations and project specifications.
Response package checklist
  • Completed bid proposal form.
  • Detailed project approach and timeline.
  • List of relevant past projects and references.
  • Proof of insurance and bonding capacity.
  • Cost breakdown and pricing strategy.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure compliance with Oregon construction regulations.
  • Adhere to local building codes and safety standards.
  • Include necessary documentation as outlined in bid instructions.
Pricing strategy
  • Consider competitive pricing aligned with similar local projects.
  • Factor in potential costs for materials and labor while ensuring profitability.
  • Offer a detailed, transparent cost structure to enhance bid appeal.
Teaming and subs
  • Consider partnering with subcontractors specializing in electrical, plumbing, or HVAC work as necessary.
  • Form alliances with local firms to enhance community presence and resources.
Risks and watchouts
  • Potential delays in project timelines due to procurement of materials.
  • Changing regulations or requirements that affect scope.
  • Underestimating costs could impact bid competitiveness.
Smart questions to ask
  • What specific improvements are prioritized for the District Administration Office?
  • Are there existing structural concerns that need to be addressed?
  • Can additional specifications be obtained during the pre-bid conference?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed scope of work for the tenant improvements is not provided.
  • No specific NAICS codes were included in the details.
  • Contract duration and post-completion support requirements are unclear.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.