ITB 22-0025 Sunset High School Track Renovation
Federal opportunity from P3404805 - Facilities Dev Dept | P3404 - Facilities Dev Dept • Beaverton School District #48J. Place of performance: OR. Response deadline: Feb 28, 2023.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
ITB 22-0025 Sunset High School Track Renovation The goal is to reconstruct the existing track area at Sunset High School, remove the existing trees along the track, and relocate the throwing events to the north of the track. This project will include selective demolition, asphalt pavement, new rubberized surface, installation of new curbing, and new track markings.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.