22-0018 ITB Classroom Walls- Phase 3
Federal opportunity from Beaverton School District #48J. Place of performance: OR. Response deadline: Dec 15, 2022.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 29 more rate previews.↓
Point of Contact
Agency & Office
Description
22-0018 ITB Classroom Walls- Phase 3
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The notice for ITB Classroom Walls- Phase 3 (22-0018) from Beaverton School District #48J is aimed at procuring construction services for classroom walls. The response deadline is set for December 15, 2022, at 14:00 UTC. This opportunity may require bidders to demonstrate experience in educational facility construction, particularly in a classroom setting.
The buyer, Beaverton School District #48J, aims to enhance or modify classroom infrastructure through the construction of new walls, ensuring that the learning environment meets current educational standards.
- Contractors with experience in educational facility construction.
- Companies that specialize in commercial interior construction.
- Local businesses with capacity to mobilize quickly.
- Review project specifications and requirements.
- Develop a project proposal outlining experience and capabilities.
- Submit completed bid packages by the response deadline.
- Prepare for a potential site visit or pre-bid meeting (if applicable).
- Completed bid form.
- References from prior educational projects.
- Proof of relevant licensing and bonding.
- Completed pricing schedule.
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Compliance with local construction codes is mandatory.
- Bidders must adhere to specified timelines for project completion.
- Consider competitive pricing to win contract while ensuring cost coverage.
- Include detailed pricing breakdown for materials and labor.
- Consider partnering with local subcontractors for specialty tasks such as electrical or mechanical work.
- Evaluate potential teaming with suppliers for materials to ensure timely delivery.
- Potential for delays in obtaining building permits.
- Risk of underestimating material costs due to inflation.
- Challenge of meeting procurement timelines given the school district's schedule.
- What specific materials are preferred or required for the classroom walls?
- Will there be a pre-bid meeting or site visit for prospective bidders?
- Are there specific safety regulations that must be followed on-site?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Specific scope details of the classroom walls project.
- Estimated budget or funding available for the project.
- Links to supporting documents or attachments for detailed requirements.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.