Painting and Patching Unit K- 02032026
Federal opportunity from DMH711120 CIN Maintenance SUBH. Place of performance: OH. Response deadline: Feb 19, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
The Ohio Department of Behavioral Health, Summit Behavioral Healthcare location is looking for a Painting Service to paint and patch the interior walls and bedrooms of Unit K. Project Overview: The vendor is responsible for patching and painting the interior walls on unit K. In addition the are 3 bedrooms/bathrooms that need painted. The goal is to achieve a clean, uniform finish throughout all specified areas. In addition to these rooms, painting/patching the nursing stations wall. The ceiling is not included 1. Project Details Spaces to be painted: The common area on unit K - walls of the unit and patient bedrooms/bathrooms. Surfaces to be painted: Walls Existing Condition: Minor patches may be required for imperfections or previous damage. 2. Scope of Work Preparation Inspect each area requiring patchwork, such as cracks, dents, or holes. Ensure all walls are dry, and free of debris before starting work. Remove or cover all furniture, fixtures, and floor surfaces to protect from dust and paint splatters. Mask and tape all baseboards, trim, and edges around ceilings, doors, and windows to ensure clean paint lines. Move or protect any electrical outlets, light fixtures, and vent covers. Patching Patch all cracks, holes, or surface imperfections using suitable materials for drywall or plaster. Sand patched areas smoothly to blend with the existing surface, ensuring a seamless finish. Conduct a final inspection to confirm all patched areas are smooth and level. Priming (if required) Apply primer to any patched areas or other areas where needed, ensuring color consistency. Painting Materials and Color: Use paint specified by the client (e.g., low-VOC paint, finish type (SATIN), and color) on walls and ceilings. Paint Application: Apply at least two coats of paint for full coverage and uniform finish. Maintain proper ventilation and temperature during the painting process. Check for uniformity in color and texture after each coat and correct any visible inconsistencies. Site visit required to be considered for project: Tuesday or Thursday - 1-3 pm Please see document tap for complete scope of work.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.