Skip to content
Bwc300810 Facilities Wgbl

Engineering Design - Fan Wall Replacement Project WGB | BWC260595 | FY26 | JD

Solicitation: Not available
Notice ID: SRC0000036549
DepartmentBwc300810 Facilities WgblStateOHPostedJan 22, 2026, 12:00 AM UTCDueJan 27, 2026, 09:06 AM UTCExpired

Federal opportunity from BWC300810 FACILITIES WGBL. Place of performance: OH. Response deadline: Jan 27, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
BWC300810 FACILITIES WGBL
Agency
Not available
Subagency
Not available
Office
Not available
Contracting Office Address
Not available

Description

Provide comprehensive engineering design services for retrofitting existing air handling units (AHUs) with a modern fan wall system, including full replacement of hot water and chilled water coils, in a 33-story commercial high-rise. The goal is to improve HVAC performance, energy efficiency, and system redundancy while minimizing operational disruption. HVAC Load Calculations: Full-building heating/cooling analysis, internal heat gains, summary report by floor and zone. Site Investigation: Multiple site visits, document mechanical rooms, verify as-built conditions. Fan Wall System Design: EC motor arrays, VFD-driven fans, duct transitions, electrical coordination, coil replacement with AHRI-certified hot water and chilled water coils. Phasing & Implementation Strategy: Maintain HVAC operation during installation, crane access, rigging paths, temporary solutions. Cost Estimating: Estimate including fan wall equipment, structural modifications, electrical upgrades, demolition, installation labor, coil replacement costs. Review & Coordination: Present findings, incorporate feedback into final design documents. A MANDATORY site visit will be conducted at: William Green Building. 30 W Spring Street, Columbus OH 43215 Site Visit Date: Thursday, January 29, 2026 Site Visit Time: 10:00 am – 12:00 pm/Noon EST Only suppliers that have attended the site visit will be eligible for award selection. **Review the Attached Document "SOW - Fan Wall William Green Building – 33-Story Building, Downtown Columbus"** **SOW - Estimated Pricing Breakdown document attached must be filled out and submitted with your proposal. Bidder must be registered with Ohio Buys and have received a payee/supplier ID. If unsure, you can verify at https://ohiopays.ohio.gov/ Pricing must remain valid for a minimum of 90 days.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.