Skip to content
Washington County

Bridge Joint Replacement, Hegeman Bridge Road over Batten Kill and CR24 over Mettawee River

Solicitation: Not available
Notice ID: 2130899
DepartmentWashington CountyAgencyDepartment of Public WorksStateNYPostedJan 22, 2026, 12:00 AM UTCDueFeb 19, 2026, 12:00 AM UTCExpired

Federal opportunity from Department of Public Works • Washington County. Place of performance: NY. Response deadline: Feb 19, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$561,809,589
Sector total $561,809,589 • Share 100.0%
Live
Median
$104,780
P10–P90
$36,558$1,117,129
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($561,809,589)
Deal sizing
$104,780 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
Washington County
Agency
Department of Public Works
Subagency
Department of Public Works
Office
Department of Public Works
Contracting Office Address
Not available

Description

Department of Public Works • Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction • Grant or notice of funds availability

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 14, 2026
Executive summary

Washington County is seeking sealed bids for the Bridge Joint Replacement at Hegeman Bridge Road over Batten Kill and CR24 over Mettawee River, with a project completion date by September 1, 2026. The project involves replacing roughly 105 ft. of joints across two bridges, requiring compliance with NYSDOT Standard Specifications finalized on September 1, 2025. Bids must be submitted by February 19, 2026, with substantial completion targeted within 90 days of the Notice to Proceed.

What the buyer is trying to do

The Department of Public Works aims to replace the deteriorated concrete joints of two bridges, ensuring safety and compliance with federal and state standards.

Work breakdown
  • Remove and replace roughly 105 ft. of bridge joints.
  • Deteriorated concrete removal surrounding the joints.
  • Ensure compliance with NYSDOT Standard Specifications.
  • Complete all work in accordance with federal and state regulations.
  • Utilize civil rights reporting software (EBO).
Response package checklist
  • Completed Bid Form.
  • Non-Collusive Bidding and Disbarment Certifications.
  • Lobbying Certifications.
  • Acknowledgement of receipt of all Addenda.
Suggested keywords
Bridge Joint ReplacementNYSDOT SpecificationsFederal Aid ProjectMinority Employment GoalWomen Employment Goal
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Details on material specifications needed for joint replacements.
  • Expected timeline for payment processes after contract award.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.