Skip to content
Washington County

Lock 8 Way over Bond Creek Superstructure Replacement, BIN 5525300

Solicitation: Not available
Notice ID: 2130657
DepartmentWashington CountyAgencyDepartment of Public WorksStateNYPostedJan 22, 2026, 12:00 AM UTCDueFeb 19, 2026, 12:00 AM UTCExpired

Federal opportunity from Department of Public Works • Washington County. Place of performance: NY. Response deadline: Feb 19, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$561,809,589
Sector total $561,809,589 • Share 100.0%
Live
Median
$104,780
P10–P90
$36,558$1,117,129
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($561,809,589)
Deal sizing
$104,780 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Place of Performance
Not listed — check the files for details.

Point of Contact

Not available

Agency & Office

Department
Washington County
Agency
Department of Public Works
Subagency
Department of Public Works
Office
Department of Public Works
Contracting Office Address
Not available

Description

Department of Public Works • Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction • General

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 14, 2026
Executive summary

The Lock 8 Way over Bond Creek Superstructure Replacement project, overseen by the Washington County Department of Public Works, invites sealed bids due by February 19, 2026. This federal aid project involves superstructure replacement and rehabilitation of existing substructures, following NYSDOT specifications. Key employment goals are set at 2.6% for minorities and 6.9% for women, with performance and payment bonds required from the winning bidder.

What the buyer is trying to do

The buyer aims to replace the superstructure of the Lock 8 Way bridge over Bond Creek while ensuring compliance with federal aid project specifications and local employment diversity goals.

Work breakdown
  • Replacement of superstructure over Bond Creek
  • Rehabilitation of existing concrete substructures
  • Highway approach work
  • Installation of necessary safety and traffic management features
Response package checklist
  • Completed Bid Form
  • Non-Collusive Bidding and Disbarment Certifications
  • Lobbying Certifications
  • DBE Participation Package (if applicable)
  • Security deposit (5% of bid amount)
Suggested keywords
bridge replacementsuperstructureNYSDOTfederal aidminority employmentwomen employmenthighway approach
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific work period dates provided; start is anticipated July 2026.
  • Lack of detailed drawings or specifications for the superstructure replacement.
  • No pre-bid meeting details shared for potential contractor inquiries.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.