Skip to content
Thruway Authority

TAA 26-12B / D215080

Solicitation: Not available
Notice ID: 2132634
DepartmentThruway AuthorityAgencyEngineering DepartmentStateNYPostedMar 17, 2026, 12:00 AM UTCDueApr 29, 2026, 12:00 AM UTCCloses in 43 days

Federal opportunity from Engineering Department • Thruway Authority, NYS. Place of performance: NY. Response deadline: Apr 29, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$759,189,881
Sector total $759,189,881 • Share 100.0%
Live
Median
$154,082
P10–P90
$30,225$2,061,280
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($759,189,881)
Deal sizing
$154,082 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
I-87 Mileposts 111.13 and 113.22
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Best fit for this contractDavis-Bacon
NY20260004 (Rev 1)
Match signal: state matchOpen WD
Published Jan 30, 2026New York • Broome, Chenango
Rate
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base $43.25Fringe $27.29
Rate
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base $38.50Fringe $25.04
+57 more occupation rates available in the full WD.
View more for this contract
3 more WD matches and 57 more rate previews.
Davis-BaconBest fitstate match
NY20260004 (Rev 1)
Open WD
Published Jan 30, 2026New York • Broome, Chenango
Rate
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base $43.25Fringe $27.29
Rate
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base $38.50Fringe $25.04
Rate
BOILERMAKER
Base $43.34Fringe $27.66
+56 more occupation rates in this WD
Davis-Baconstate match
NY20260047 (Rev 1)
Open WD
Published Jan 30, 2026New York • Allegany
Rate
CEMENT MASON/CONCRETE FINISHER
Base $38.63Fringe $25.05
Rate
Carpenter and Piledriver HEAVY AND HIGHWAY CONSTRUCTION Carpenter
Base $38.18Fringe $26.11
Rate
Piledriver
Base $41.66Fringe $28.46
+34 more occupation rates in this WD
Davis-Baconstate match
NY20260036 (Rev 1)
Open WD
Published Jan 30, 2026New York • Cayuga
Rate
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base $43.25Fringe $27.29
Rate
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base $38.50Fringe $25.04
Rate
BOILERMAKER
Base $35.23Fringe $26.61
+29 more occupation rates in this WD
Davis-Baconstate match
NY20260016 (Rev 1)
Open WD
Published Jan 30, 2026New York • Onondaga
Rate
BRICKLAYER BRICKLAYERS, POINTER, CLEANERS & CAULKERS
Base $38.30Fringe $23.71
Rate
CEMENT MASONS
Base $38.63Fringe $25.05
Rate
MARBLE, TILE & TERRAZZO FINISHERS
Base $26.46Fringe $19.64
+27 more occupation rates in this WD

Point of Contact

Not available

Agency & Office

Department
Thruway Authority, NYS
Agency
Engineering Department
Subagency
Engineering Department
Office
Engineering Department
Contracting Office Address
Not available

Description

Engineering Department • I-87 Mileposts 111.13 and 113.22 • Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction • General

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.