Skip to content
People with Developmental Disabilities

2026 - 2031 Heating, Ventilation, and Air Conditioning (HVAC) and Water Heater Inspections, Start Up, and/or Maintenance and Repair/Replacement Service in Clinton, Essex, Franklin, Hamilton, and St. Lawrence Counties

Solicitation: Not available
Notice ID: 2132318
DepartmentPeople with Developmental DisabilitiesAgencyContract UnitStateNYPostedMar 03, 2026, 12:00 AM UTCDueApr 14, 2026, 12:00 AM UTCCloses in 42 days

Federal opportunity from Contract Unit • People with Developmental Disabilities, NYS Office for. Place of performance: NY. Response deadline: Apr 14, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$67,616,604,020
Sector total $67,616,604,020 • Share 100.0%
Live
Median
$307,336
P10–P90
$30,236$4,976,638
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($67,616,604,020)
Deal sizing
$307,336 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Live POP
Place of performance
Various Sites
Contracting office
Not listed

Applicable Wage Determinations

SAM WDOL references matched to this opportunity's location and scope language.

WD Directory →
Published Jan 30, 2026
New York • Orange
HANDLER (Duties limited to preparation, wetting, stripping, removal, scraping, vacuuming, bagging and disposing of all insulation materials whether they contain asbestos or not from mechanical systems)
Base: $46.62 • Fringe: $49.30
Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)
Base: $46.62 • Fringe: $49.30
Bricklayer, Cement Mason, Plasterer
Base: $43.04 • Fringe: $34.99
Match signal: state match
Published Jan 30, 2026
New York • Otsego
coatings and finishings to all types of mechanical systems. Also the application of firestopping material to openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement
Base: $43.25 • Fringe: $27.29
F WORK: DUTIES LIMITED TO preparation, wetting, stripping, removal, scrapping, vacuuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not from mechanical system
Base: $38.50 • Fringe: $25.04
BOILERMAKER
Base: $43.34 • Fringe: $27.66
Match signal: state match
Published Jan 30, 2026
New York • Jefferson
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base: $43.25 • Fringe: $27.29
BRICKLAYER (Includes Pointing, Caulking, and Cleaning)
Base: $33.45 • Fringe: $20.14
TILE SETTER
Base: $31.81 • Fringe: $17.50
Match signal: state match
Published Jan 30, 2026
New York • Madison
ASBESTOS WORKER/HEAT & FROST INSULATOR (Duct, Pipe, & Mechanical System Insulation)
Base: $43.25 • Fringe: $27.29
TILE SETTER
Base: $31.81 • Fringe: $17.50
BRICKLAYER (Includes Pointing, Caulking, and Cleaning)
Base: $33.16 • Fringe: $19.77
Match signal: state match

Point of Contact

Not available

Agency & Office

Department
People with Developmental Disabilities, NYS Office for
Agency
Contract Unit
Subagency
Contract Unit
Office
Contract Unit
Contracting Office Address
Not available

Description

Contract Unit • Various Sites • Facilities, Maintenance, Repair & Building Operations • General

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.