Skip to content
Alden

Cayuga Creek Waterline

Solicitation: Not available
Notice ID: 2130907
DepartmentAldenAgencyTown SupervisorStateNYPostedJan 23, 2026, 12:00 AM UTCDueFeb 18, 2026, 12:00 AM UTCExpired

Federal opportunity from Town Supervisor • Alden, Town of. Place of performance: NY. Response deadline: Feb 18, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for NY
Live POP
Place of performance
Cayuga Creek Road and Three Rod Road in the Town of Alden, NY
State: NY
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Alden, Town of
Agency
Town Supervisor
Subagency
Town Supervisor
Office
Town Supervisor
Contracting Office Address
Not available

Description

Town Supervisor • Cayuga Creek Road and Three Rod Road in the Town of Alden, NY • Utilities & Green Energies • General

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 14, 2026
Executive summary

The Town Supervisor is soliciting bids for the installation of 6,123 lineal feet of 8" water line along Cayuga Creek Road and 316 lineal feet along Three Rod Road, all within the Town of Alden. The response deadline is set for February 18, 2026, providing a narrow window for interested bidders. This project requires adherence to specific design plans and project documents, which are crucial for compliance.

What the buyer is trying to do

The buyer aims to install essential water infrastructure by properly extending the waterline in the specified areas, ensuring adequate service within the community.

Work breakdown
  • Preparation of site for installation
  • Installation of 6,123 lineal feet of 8" water line along Cayuga Creek Road
  • Installation of 316 lineal feet of 8" water line along Three Rod Road
  • Post-installation testing and compliance checks
  • Final documentation and project closure
Response package checklist
  • Completed bid proposal form
  • Proof of experience and relevant project completions
  • Detailed project timeline
  • Compliance with design documents and specifications
  • Pricing breakdown and cost estimates
Suggested keywords
water line installationmunicipal infrastructureCayuga Creek RoadThree Rod RoadAlden
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed timeframe for project milestones
  • Specific compliance requirements from local authorities
  • Information on additional permits needed for the project

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.