MBE/WBE/SDVOB Opportunity: Rehabilitation / Replacement of Wastewater Treatment Plant at the Chittenango Service Area – Chittenango, Madison County, NY
Federal opportunity from NY. Place of performance: NY. Response deadline: Mar 04, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
Wastewater Treatment Plant (WWTP) located at the Chittenango Travel Plaza. Chittenango Travel Plaza on the westbound lane of I-90 between Exit 34 (Chittenango) and Exit 35 (Dewitt) in the Town of Chittenango, Madison County. It is located at milepost 266. • Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction • Contractor Ads
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Chittenango Service Area project presents a significant opportunity for MBE/WBE/SDVOB contractors to participate in the Rehabilitation and Replacement of the Wastewater Treatment Plant in Madison County, NY. With a set-aside of 3.00% for SDVOB and 8.00% each for MBE and WBE, this project emphasizes inclusion of certified subcontractors. Key work includes demolition, new installations, and extensive upgrades to treatment facilities. Interested bidders should review the detailed bid documents linked in the opportunity.
The buyer, W.M. Schultz Construction, Inc., is seeking competitive quotes from qualified subcontractors and suppliers to fulfill key components of the wastewater treatment plant project, thereby enabling efficient, compliant project completion.
- Demolition and abandonment of existing headworks and process equipment
- Installation of new influent and effluent piping and manholes
- Earthwork, grading, pavement, and restoration
- Heat tracing and insulation of shallow-buried piping
- Electrical and control system upgrades, including new power and hazardous area sealing
- Completed proposals detailing scope of work
- Proof of MBE/WBE/SDVOB certification
- Pricing breakdown per required work scope
- Form confirming NYSDOL registration
Source coverage notes
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- No details on the exact bid documents provided beyond the link
- Specific contact information for W.M. Schultz Construction, Inc. not included
- Clarification on the timeline for the project beginning and completion is unavailable
- Absence of information on pre-bid meetings or site visits planned
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.