Skip to content
Ny

Lake Shore Road 48-Inch Transmission Main Rehabilitation, Ph. 2, Town of Evans, NY

Solicitation: Not available
Notice ID: 2131535
DepartmentNyStateNYPostedFeb 10, 2026, 12:00 AM UTCDueFeb 17, 2026, 12:00 AM UTCExpired

Federal opportunity from NY. Place of performance: NY. Response deadline: Feb 17, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for NY
Live POP
Place of performance
Town of Evans, NY
State: NY
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
NY
Agency
Not available
Subagency
Not available
Office
Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction
Contracting Office Address
Not available

Description

Town of Evans, NY • Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction • Contractor Ads

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Feb 14, 2026
Executive summary

This opportunity involves the Lake Shore Road 48-Inch Transmission Main Rehabilitation, Ph. 2, located in the Town of Evans, NY, with proposals due by February 13, 2026, at 12:00 PM. Mark Cerrone, Inc. is specifically looking for subcontractor and supplier proposals, encouraging participation from certified Minority and Women Owned Business Enterprises with a goal of 10%. The project documents can be accessed online or through the estimator, Nick Barile.

What the buyer is trying to do

Mark Cerrone, Inc. aims to rehabilitate a significant section of the transmission main to improve infrastructure in the Town of Evans, and is seeking qualified subcontractors and suppliers to support this effort.

Work breakdown
  • Contractor proposal submissions
  • Scope of work review and compliance
  • Accessing contract documents from iSqFt
  • Participation in optional MWBE pre-bid meeting
  • Final proposal submission by the due date
Response package checklist
  • Company profile and certification details
  • Detailed pricing for proposed work
  • Schedule of work timeline
  • MWBE participation plan
  • Completed proposal forms as per contract specifications
Suggested keywords
Lake Shore Road RehabilitationTransmission MainSubcontractor proposalWBE participationInfrastructure improvements
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • No specific pricing details provided for proposals
  • Scope of work specifics are not detailed beyond rehabilitation
  • No information on contingency plans or project timeline provided
  • Lack of clarity on penalties for late submissions
  • Absence of contact information for direct inquiries beyond the estimator

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.