Skip to content
Truckee Meadows Water Authority

Prequalification for Major Equipment Suppliers - Turbine and Generator System

Solicitation: Not available
Notice ID: nv_ionwave__washoe-hydroelectric-powerhouse-improvements
DepartmentTruckee Meadows Water AuthorityStateNVPostedFeb 17, 2026, 12:00 AM UTCDueMar 17, 2026, 10:00 AM UTCCloses in 21 days

Federal opportunity from Truckee Meadows Water Authority. Place of performance: NV. Response deadline: Mar 17, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$911,043,549
Sector total $911,043,549 • Share 100.0%
Live
Median
$100,000
P10–P90
$27,832$2,512,540
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($911,043,549)
Deal sizing
$100,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for NV
Live POP
Place of performance
Reno, NV USA
State: NV
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Truckee Meadows Water Authority
Agency
Not available
Subagency
Not available
Office
Zeke Johnson
Contracting Office Address
Not available

Description

This request for pre-qualifications is on behalf of RSCI not for Truckee Meadows Water Authority. All evaluations will be made by RSCI. DO NOT SUBMIT YOUR PREQUALIFICATION APPLICATION IN NGEM. FOLLOW THE INSTRUCTIONS OUTLINED IN THE DOCUMENT UPLOADED ON THE ATTACHMENTS TAB. RSCI is the Construction Manager at Risk (CMAR) hereby requesting that Major Equipment Suppliers submit Statement of Prequalification Applications pursuant to NRS chapter 338.16991 for the above project. Major Equipment items include: Turbine and Generator System The system includes the Turbine, Generator, Lubrication System, Neutral/Grounding Transformer, 5kV Line-up and Protective Relays, along with other associated features of work. Turbine Isolation Valves, along with Controls and SCADA for the Hydroelectric system, will be pursued as bid options . If necessary, the selected Supplier shall provide all necessary control descriptions and support for the Owner (TMWA) to complete system programming. This facility is part of a run of the river hydroelectric system that utilizes up to 86 FT of head and 400 CFS of flow to generate 2.8MW. Supplier experience with hydroelectric systems of similar size and configuration is favorable. Special Federal Conditions will apply in order for this project to be eligible for Federal Tax Credits.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.