SUNSET ROAD PHASE 1 - DURANGO DRIVE TO DECATUR BOULEVARD
Federal opportunity from Clark County, Nevada. Place of performance: NV. Response deadline: Mar 23, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
Point of Contact
Agency & Office
Description
Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The Work to be performed under this Contract is for Sunset Road Phase I, project limits is from Durango Drive to Decatur Boulevard. The improvements include asphalt pavement widening to provide minimum two travel lanes in each direction, center left-turn lanes, signage and striping, utility adjustments and relocations, and other appurtenances as may be necessary to construct a complete and functional roadway.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.