Pinto Campus IT, Boiler Replacement
Federal opportunity from Clark County, Nevada. Place of performance: NV. Response deadline: Apr 02, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Applicable Wage Determinations
SAM WDOL references matched to this opportunity's location and scope language.
View more for this contract3 more WD matches and 53 more rate previews.↓
Point of Contact
Agency & Office
Description
Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. The work consists of all labor, materials, utilities, permits, devices, systems and equipment necessary to demo one (1) existing 250mbh Lochinvar atmospheric boiler and (1) existing boiler circulation inline pump, air separator, expansion tank, piping, supports, devices and other associated systems per project drawings within this set of plans and manuals, and replace with (2) 500mbh non condensing (near condensing) boilers, working in unison and providing redundancy, and (2) boiler circulation pump, piping, supports, devices and other associated systems as required for successful installation and operation of the systems. "Work" at boiler room and adjoining air handler room, both are referred as "mechanical rooms" also consist of piping/fittings, hydronic valves and appurtenances, control valves, piping supports, equipment pads, natural gas piping, floor drain and floor sink and associated piping, flue and combustion piping and electrical power as necessary for removal of existing and connection to the new equipment and systems. Natural gas service work includes removal of existing meter, regulator and piping and installation of (1) natural-gas meter, regulator and associated piping and coordination with southwest gas company. Roofing work includes patching the existing flue pipe roof opening and new roofing for (2) boiler flue vent pipes. Structural concrete work includes extending the existing 4" concrete pad inside the mechanical room to accommodate for installation of new boilers. Providing wall openings for combustion air louvers. "Work" includes testing, adjusting and balancing the entire hot water hydronic heating system. System commissioning to be provided per requirements of contract documents. "Work" includes Johnson Controls "JCI" to remove existing controls and connect new systems and integrate to existing control systems. Contractor to contract JCI for new controls and sequencing setup, and integration of the new and existing BACnet control systems. For the Pre-Bid conference, site walk and Bid closing details, please see the Activities Tab.
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.