Skip to content
City of North Las Vegas

NLVPD Northwest Area Command Center HVAC Replacement Project

Solicitation: Not available
Notice ID: nv_ionwave__1780
DepartmentCity of North Las VegasStateNVPostedFeb 18, 2026, 12:00 AM UTCDueMar 17, 2026, 10:00 AM UTCCloses in 19 days

Federal opportunity from City of North Las Vegas. Place of performance: NV. Response deadline: Mar 17, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for NV
Live POP
Place of performance
2250 Las Vegas Boulevard North, Ste. 243 North Las Vegas, NV 89030 USA
State: NV
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
City of North Las Vegas
Agency
Not available
Subagency
Not available
Office
Allan Fajardo, P.E., PTOE
Contracting Office Address
Not available

Description

The NLVPD Northwest Area Command Center project site is located at 3755 W. Washburn Road, North Las Vegas, NV 89031. The Work involves removing and replacing heat pump systems, furnishing and installing all new HVAC units, reconnecting thermostats, disconnecting and abandoning wiring, proper startup and operation, securing necessary permits to meet code requirements, retrofitting, removal and disposal of removed units, and associated appurtenances.

The project shall be completed within 75 consecutive calendar days from the date specified in the Notice-to-Proceed, which time shall include resolution of all punch list items, final cleanup and demobilization. The estimated construction cost ranges from $140,000 to $160,000.

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.