Skip to content
City of Henderson

Street Lighting Retrofit - Phase I

Solicitation: Not available
Notice ID: nv_ionwave__ifb-127-26-street-lighting-retrofit-phase-i-addendum-3
DepartmentCity of HendersonStateNVPostedFeb 03, 2026, 12:00 AM UTCDueMar 04, 2026, 02:00 PM UTCCloses in 6 days

Federal opportunity from City of Henderson. Place of performance: NV. Response deadline: Mar 04, 2026.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$68,699,272,131
Sector total $68,699,272,131 • Share 100.0%
Live
Median
$253,715
P10–P90
$29,763$10,909,709
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($68,699,272,131)
Deal sizing
$253,715 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.

We write these bids →
Open on official portal →
Map for NV
Live POP
Place of performance
240 S Water St Henderson, NV 89015 USA
State: NV
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
City of Henderson
Agency
Not available
Subagency
Not available
Office
Luke Fritz
Contracting Office Address
Not available

Description

This project aims to enhance safety and infrastructure resilience by upgrading existing streetlight systems and replacing oxidized or deteriorated poles. The scope of work includes replacing compromised poles to improve durability and ensure long-term reliability. Construction activities will take place along the following roadway segments: Basic Road (from Lake Mead Parkway to Pacific Avenue), Pacific Avenue (from Fairway Road to Basic Road), Magnesium Street (from Basic Road to Manganese Street),Tungsten Street (from Victory Road to Pacific Avenue), Victory Road (from Van Wagenen Street to Basic Road), Nickel Street (from Basic Road to W Atlantic Road), Zinc Street (from Basic Road to W Atlantic Road), Platinum Street (from Basic Road to W Atlantic Road), Gold Street (from Basic Road to W Atlantic Road), Atlantic Avenue (from Lake Mead Parkway to Pacific Avenue),Copper Street (from W Atlantic Road to Magnesium Street), Manganese Street (from W Atlantic Road to Magnesium Street), Iron Street (from Magnesium Street to Victory Road), Perlite Way(from Lake Mead Parkway to Victory Road), Ilmenite Way (from cul-de-sac to Victory Road), Rutile Way (from cul-de-sac to Victory Road), Zirconium Way (from cul-de-sac to Victory Road), Tin Street (from Ocean Avenue to Basic Road), and Lynn Lane (from Basic Road to Tin Street).

Engineer's Estimate: $1,100,000.00

Files

Files size/type shown when available.

No downloadable attachments detected for this notice.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.

FAQ

How do I use the Market Snapshot?

It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.

Is the data live?

The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.

What do P10 and P90 mean?

P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.