Street Lighting Retrofit - Phase I
Federal opportunity from City of Henderson. Place of performance: NV. Response deadline: Feb 25, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
This project aims to enhance safety and infrastructure resilience by upgrading existing streetlight systems and replacing oxidized or deteriorated poles. The scope of work includes replacing compromised poles to improve durability and ensure long-term reliability. Construction activities will take place along the following roadway segments: Basic Road (from Lake Mead Parkway to Pacific Avenue), Pacific Avenue (from Fairway Road to Basic Road), Magnesium Street (from Basic Road to Manganese Street),Tungsten Street (from Victory Road to Pacific Avenue), Victory Road (from Van Wagenen Street to Basic Road), Nickel Street (from Basic Road to W Atlantic Road), Zinc Street (from Basic Road to W Atlantic Road), Platinum Street (from Basic Road to W Atlantic Road), Gold Street (from Basic Road to W Atlantic Road), Atlantic Avenue (from Lake Mead Parkway to Pacific Avenue),Copper Street (from W Atlantic Road to Magnesium Street), Manganese Street (from W Atlantic Road to Magnesium Street), Iron Street (from Magnesium Street to Victory Road), Perlite Way(from Lake Mead Parkway to Victory Road), Ilmenite Way (from cul-de-sac to Victory Road), Rutile Way (from cul-de-sac to Victory Road), Zirconium Way (from cul-de-sac to Victory Road), Tin Street (from Ocean Avenue to Basic Road), and Lynn Lane (from Basic Road to Tin Street).
Engineer's Estimate: $1,100,000.00
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.