UNR - Construct ADA Curb Cuts South of Chemistry Building
Federal opportunity from BCN Purchasing. Place of performance: NV. Response deadline: Mar 26, 2026.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.
Point of Contact
Agency & Office
Description
BCN Purchasing does not accept physical documents in response to any solicitation including but not limited to: ITB, RFP, RFQ, or CMAR solicitations. All documents must be submitted electronically via this website. The NGEM system allows for bidders to start and save work/uploads without submitting. Please make use of this capability to begin building your bid early and reduce the chances of internet connectivity or upload issues causing a last-minute inability to submit. Once the ITB/RFP/RFQ/CMAR closes and the responses are unsealed electronically, the list of bidders/responders will be posted online shortly thereafter and available to the public for viewing. This document can be accessed by clicking on Closed Bid Opportunities, selecting the specific opportunity, and scrolling down to Bid Documents. The Bid Tabulation document will be available for review there. Description of Work: Construct ADA compliant raised crosswalk on the south side of Chemistry Building that will Connect to Harry Reid Engineering Building. UNR Project#: # 24MNC02929 Labor Commissioner #: WA-2026-238 SPWD Project #: 26-B010 Estimated Cost Range: $7,515 to $107,515 Liquidated Damages: $200 per day. Special Considerations: Construction Blackout dates: UNR spring commencement Wednesday, May 14 - Saturday, May 16. Work must be completed by July 20, 2026. Staging of construction materials is allowed at Silver-12 surface parking lot, north of the Harry Reid Engineering Laboratory or to the east of the Physics building, adjacent to the mechanical yard. The Silver-12 surface parking lot will be closed to parking for the duration of the construction project. Required Insurance if Awarded: Commercial General Liability, Business Automobile Liability, Workers' Compensation, Pollution Liability, and Contractors Equipment (including any equipment for the job) will be required. Please refer to the TEMPLATE-Owner-Contractor Construction Agreement on the Attachments tab for limits and additional information and in compliance with the requirements set forth here: https://www.unr.edu/bcn-nshe/risk/contracts. Completion of Work: Subject to change by Owner, Work is scheduled to begin on "May 18, 2026" and shall be fully complete by "July 20, 2026."
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
FAQ
How do I use the Market Snapshot?
It summarizes awarded-contract behavior for the opportunity’s NAICS and sector, including a recent pricing band (P10–P90), momentum, and composition. Use it as context, not a guarantee.
Is the data live?
The signal updates as new awarded notices enter the system. Always validate the official award and solicitation details on SAM.gov.
What do P10 and P90 mean?
P10 is the 10th percentile award size and P90 is the 90th percentile. Together they describe the typical spread of award values.